Road Closure on East Side of Manlius for Road Paving April 11th and 12th

SHARE NOW

Road paving will close roads for the section closed for structure replacement last year and the detour route on the east side of Manlius. Paving operations will begin at 7 AM until 4 PM on April 11th and 12th, 2024.  There will not be a path available to get east out of town from Main Street. This closure involves what had been the detour route while the structure was under construction.

Update: Arrangements have been made with the contractor to have either a way around or one-lane open through the project tomorrow and Friday in the Village of Manlius.  Traffic control will be on site, so please be prepared for possible minor delays, but there will be a path available from Manlius proper to the roadway immediately east of the structure site and beyond.

Submit a Comment