• Cold Weather Advisory - Click for Details
    ...COLD WEATHER ADVISORY REMAINS IN EFFECT FROM 3 AM TO NOON CST MONDAY...
    Expires: January 19, 2026 @ 12:00pm
    WHAT
    Very cold wind chills as low as 20 to 30 below expected.
    WHERE
    Portions of north central and northwest Illinois and east central and southeast Iowa.
    WHEN
    From 3 AM to noon CST Monday.
    IMPACTS
    The dangerously cold wind chills could cause frostbite on exposed skin in 30 minutes or less. Frostbite and hypothermia will occur if unprotected skin is exposed to these temperatures.
    PRECAUTIONARY/PREPAREDNESS ACTIONS
    Use caution while traveling outside. Wear appropriate clothing, a hat, and gloves. Keep pets indoors as much as possible. Make frequent checks on older family, friends, and neighbors. Ensure portable heaters are used correctly. Do not use generators or grills inside.

Loading advertisement…

Residents Invited to Share Feedback on US Route 150 Reconstruction Plans in Galesburg on November 20, 2025

SHARE NOW

Area residents have an opportunity to weigh in on major reconstruction plans for U.S. Route 150 in Galesburg. The Illinois Department of Transportation will host an open house public meeting on Thursday, November 20th, from 5 to 7 PM at King Elementary School Gymnasium. Attendees can review project exhibits and speak directly with IDOT staff about proposals for new pavement, curbs, sidewalks, shared-use paths, and intersection improvements. During reconstruction, Grand Avenue is expected to close temporarily to westbound traffic. Public input is invited—comments accepted at the meeting, by mail, or email through December 5th.


PUBLIC MEETING ANNOUNCEMENT
U.S. ROUTE 150 (MAIN ST. AND GRAND AVE.) RECONSTRUCTION PROJECT
KNOX COUNTY
date: THURSDAY, NOVEMBER 20, 2025
time: 5-7 p.m.
Location: KING ELEMENTARY SCHOOL GYMNASIUM
1018 S. FARNHAM ST. / GALESBURG, IL 61401

The Illinois Department of Transportation (IDOT) has scheduled an open house public meeting for the purpose of providing information and receiving input on the proposed improvement of U.S. Route 150 (Main St.) from Allens Ave. to Grand Ave. and of U.S. Route 150 (Grand Ave.) from Main St. to Logistics Parkway/Knox County Highway 32 in Galesburg.

All interested persons are invited to attend and participate. Project exhibits will be available for review. In addition, IDOT staff members will be available to receive input, provide information, and answer questions. No formal presentation will be given.

Proposed improvements include:

  • Reconstruction of the roadway with new pavement, curb and gutter, and storm sewer
  • Sidewalks
  • Shared-use paths
  • Intersection improvements
  • It is proposed to temporarily close Grand Ave. to westbound traffic during reconstruction of the roadway to reduce construction duration and cost.

The public is encouraged to submit comments. Comments can be submitted at the meeting, mailed to the address listed below, or submitted electronically to the email address listed below. Comments received by December 5, 2025, will become part of the public meeting record.

For more information about this meeting, or the project in general, contact:

Ms. Karen Dvorsky, Program Development Engineer
Illinois Department of Transportation
401 Main St. / Peoria, IL 61602
Phone: 309-671-3491
Email: [email protected]

The meeting location is accessible to people with disabilities. For special accommodations, please contact Ms. Karen Dvorsky at the address or phone number above at least five days before the meeting.

Submit a Comment